Kapar Energy Ventures Sdn Bhd: Kapar Power Station, Kapar, Malaysia

Solutions deployed in Kapar Power Station are as follows:
1. Plant-wide DBDOC system for Bailey DCS
2. Plant-wide Matrikon Alarm Management System
3. OIS40 Series console hardware migration solution, GPCA-OIS4x for OIS42 in Phase 2
4. OIS40 Series console hardware migration solution, GPCA-OIS4x for OIS42 in Phase 3
4. Process Control Analysis & Tuning Training
5. Control system logic and graphics configuration
6. Wireless Network Systems
7. National Instruments Compact Controller
8. Allen-Bradley PLC for Boiler Temperature System in Phase 3
9. Vartech industrial displays for OIS40 Consoles
10. Digital Equipment Corporation (DEC) network device configuration and support

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Picture
Picture

PT Paiton Energy (IPMOMI): Paiton Power Station, Indonesia

Solutions deployed in Paiton Power Station are as follows:
1. OIS40 Series console hardware migration solution, GPCA-OIS4x

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Picture
 

EGAT: Mae Moh Power Station, Thailand

Solutions deployed in Mae Moh Power Station are as follows:
1. OIS40 Series console hardware migration solution, GPCA-OIS4x